Po shʉ' si' nkwat pu' bα

Equipment and infrastructures

 

Electricity:
Only partial equipment since 1990 through the combined effort of the j Development Committee and Sonel. About a hundred connections are functional for the time being.
 
Telephone:
Operation of mobile telephone since 2000. Possible emission et reception by both big operators (Mtn et Orange).
 
Water:
Uncompleted equipment: Tank of 24 m3; sinking and taps flowing, about 10Km of pipe; ten public taps but inintermittent use.
 
Teaching:
a Public primary school, a Protestant primary school, a Catholic primary school, a Private Secondary School (1998).
 
Health:
A private Protestant health Centre at Bankoh, being run with the help of the elite. This centre has about 30 beds and brings general treatment of first aid, has a little surgery and a maternity branch.
 
Communication infrastructure:
The provincial 15 crosses community over 6 km from Bafang towards Yabassi/Bakou. '(Car lanes: towards Bakassa through Bankoh/towards Bakondji through Balouk or Njinga/towards Bassap after Baboné).
 

Time

Annonces

Contact

Impressum

© Baboutcheu-Ngaleu 2003